NCM_1_Aerial-View
NCM_2_Museums'-Square
B03Entrance-to-the-Museum
NCM_4_Interior-Foyer
NCM_5_Foyer-Entrance-Stair
NCM_28b_Riverside
NCM_28c
NCM_30
NCM_31
NCM_32
NCM_32B_Square-side-view
NCM_33
NCM_34
NCM_35
NCM_36
NCM_39
NCM_37
NCM-DR-1010_PlanB2
NCM-DR-1020_PlanB1
NCM-DR-1030_PlanL0
NCM-DR-3000_section-diagrams
NCM_6_διαγραμματα-εκθεσης
NCM-DR-1040_PlanL1
NCM-DR-1050_PlanL2
NCM_7_K1_Interactive-LightMix_View01-copy-(a)
NCM_8_K1_Interactive-LightMix_View02-copy-(a)
NCM_9_K1_Interactive-LightMix_View04
NCM_10_K1_Interactive-LightMix_View06
NCM_11_K1_Interactive-LightMix_View06b
NCM_12_K1_Interactive-LightMix_View09
NCM_13_K1_Interactive-LightMix_View13
NCM_14_Permanent-Exhibition-Volume-III
NCM_15_k2_Interactive-LightMix_View02
NCM_16_k2_Interactive-LightMix_View04
NCM_17_k2_Interactive-LightMix_View05
NCM_18_k3_Interactive-LightMix_View01
NCM_19_k3_Interactive-LightMix_View02
NCM_20_Permanent-Exhibition-Volume-III-L2
NCM_21_k3_Interactive-LightMix_View06
NCM_11_K1_Interactive-LightMix_View06b
NCM_23_k3_Interactive LightMix_View09
NCM_24_k3_Interactive-LightMix_View10
NCM_25_k3_Interactive-LightMix_View13
NCM_26_k3_Interactive-LightMix_View18
NCM_27_k3_Interactive-LightMix_View14
NCM_22_k3_Interactive-LightMix_View08
NCM-DD-7001-P2
NCM-DD-7020-P2
NCM-DR-3000_structural-diagrams
NCM-DD-7010-P2
NCM_22_Aerial

New Cyprus Museum – Complete Studies

Complete Studies
Location: Nicosia, Cyprus
Year: 2019-2021
Client: Ministry of Transport, Communications and Works
Area: 27.700 m² & 23.000 m² landscape

ARCHITECTURAL DESIGN:

THEONI XANTHI XZA ARCHITECTS LLC

LEADER ARCHITECT:

THEONI XANTHI

ASSOCIATE ARCHITECTS:

THEODOROS ANDROULAKIS,

MARGARITA ZAKYNTHINOU-XANTHI

ARCHITECTURAL STUDY COORDINATOR:

KOSMAS VARKAROLIS

 

CONSULTANTS:

ARCHITECTURAL:   YAP ARCHITECTS – Y. ANDREADIS,

FEREOS ARCHITECTS LLC – P. FEREOS (Deputy Project Architect),

VAP ARCHITECTS – V. POUTETSIS

STRUCTURAL:   PENELIS CONSULTING ENGINEERS SA – G. PENELIS  (Engineer on Record),

ANDREAS EVRIPIDOU CIVIL ENGINEERS L.L.C. – A. EVRIPIDOU,

RHOMBUS STRUCTURAL ENGINEERS LLC -S. EFSTRATIADIS

MECHANICAL: GEORGHIOU & ZEMBYLAS PARTNERS

ELECTRICAL: GEORGHIOU & ZEMBYLAS PARTNERS

MUSEUM CONCEPT: XZA ARCHITECTS

MUSEOLOGY:    T. TSOUKALAS,  S. GALIKAS

MUSEOGRAPHY: T. TSOUKALAS,  S. GALIKAS, T. PEPTRAS

GRAPHIC: POST-SPECTACULAR OFFICE – S. GALIKAS

QUANTITIES SURVEY: G. RODITIS & PARTNERS – G. RODITIS

ACOUSTIC: THETA ACOUSTICS LTD – T. ΝΙΑΟUΝΑΚIS

SAFETY – HEALTH: FLOROS PANTELI ASSOCIATES L.L.C. – F. PANTELI

LIGHTING: E. DEKO & ASSOCIATES – E. NTEKO

WAY-FINDING: POST-SPECTACULAR OFFICE –  S. GALIKAS

TRAFFIC: DROMOS CONSULTING LTD – Κ. ZEKKOS

HYDRAULICS: DROMOS CONSULTING LTD – Κ. ZEKKOS

FIREFIGHTING: INT FIRE (CYPRUS) LTD – Dr S. SPIROU

LANDSCAPE: LANDCO ΕΠΕ – Μ. KANTARTZIS

LABORATORIES: E. VASILEIOU – PRELIMINARY DESIGN: Α. SAKELLARIOU

SPECIAL GEOTECHNICS: Μ. KAVVADAS

SECURITY BUILDING: ARION PLUS

NATURAL LIGHTING: Α. TSAGKRASOULIS

KITCHEN EQUIPMENT: XENEX – D. KALOGERIAS

SHELL ENERGY PERFORMANCE: METABUILD

In 2019-2021, the complete studies were held by 22 study groups of different specialties which collaborated in 4 countries to complete the study of a modern museum which, apart from the permanent exhibition spaces (7,500sqm), included complex functional units (27,700sqm in total) and outdoor and urban landscaping (23,000sqm).

A long and intense collaboration with the Department of Antiquities of Cyprus was also required in order to finalize the issues of the archaeological collections and the permanent Exhibition for the completion of the Museological and Museographical study. At the same time, there was close cooperation with the employees of the Department, in order to determine the specifications and equipment of the Conservation Laboratories.

Flood protection was also carefully provisioned, due to the Pedieos River, over a period of 200 years.

The energy design of the complex was done in order to meet the category of “almost zero energy footprint” in accordance with the requirements of the legislation.

Finally, a common component of all stages was the effort to keep the total cost of the project within the defined framework of the Contract.

In September 2022, the process to tender for the construction contract for the NCM development was successfully completed, and CYFIELD JOINT VENTURE & IACOVOU (€121,000,000 +) was selected as the contractor. Construction begun in 2023.